Future Plans
The mega project of Club House Block is under fast progress
with Basement, Ground Floor and three floors on the above.
We will be able to have adequate Parking space, Conference
Halls, Cards Room, Lounges, Library, Multipurpose Halls,
Home Theatre VIP Cabins, and Administrative Blocks with
Individual chambers for the heads of the Executive Committee
and many other spacious comforts after the completion of
this project. The work is being executed by the widely reputed
consolidated construction consortium CCC of (L&T).
PROJECTS
NEW ADMINSTRATIVE BLOCK 29,500
sq.ft. (Lower, Ground, First, Second & Terrace)
Facilities
-
Car parking for 42 Cars-Lower
-
Car parking for 21 Cars-Ground
-
Entrance Lobby/Reception
-
Deck
-
Cards Room, Office, Conference Hall,
Lobby, Toilets-Second Floor, Third Floor Terrace Party
Area, Toilets.
-
Cyber Café.
-
Gymnasium, Sauna Both, etc.
-
Herbal Treatment
1.Tread mil
2.Cross Trainer
3.Upright Exercise Bike
4.Recumber Exercise Bike
5. 3 Stalk Multi Gym
6. Abdominal Board
7. Stretch Strainer
8. Dumbles
Health Club Interior Decoration
Complete Teak Wood Cornish and Beedings Plywood Panelling
with lamination and superior Quality Wall Papers, Soft Board
for display. Full size modi guard mirrors, Flexiwood Flooring
works undertaken
Health Club Change Room
Brink Wall construction, plastering ceramic wall tiles ,
antiskid tiles for floor, Jaguar/ Florentine pluming and
sanitary fittings completed.
TV for Health Club
Sony Flat TV 29'' provide for the Health Club.
Swimming Pool
Civil works consisting of 1550 sq.ft. Floor
area, 3 to 4 feet water depth with 6 no. Skimmers and water
drain floor and sidewall finished with Bissaza tiles. Granite
covered landing steps, Electrical fittings, Bullnosed Sirastone
laid all around the swimming pool, provide plumbing and electrical
line at required places, this grade fiber glass European make
sand filter with filter media provided for filtering the pool
water. Pressure gauge, relief valve, Kirloskar make 3 HP Recirculation
pump provided.
Toddler's Pool
On 133 sq.ft. Floor area, skimmer, plumbing and electrical
lines, floor and side wall with Bissaza tiles, Bullnosed Rough
polished sira stone provided all round the pool.
Filtration room
Constructed with brick wall, RCC Roof, outer surface sira
stone cladding and stecko paint finish, plumbing lines, electrical
wiring and lamp M.S.Rolling shutter fitted.
Deck Area
Excavating and lifting of excess earth, providing and laying
of pcc 1:4:8, purchase and fixing of European Tiles 2053 sq.ft.
laying of sira Stone Border, Water Drainage, Sump Plumbing,
External Shower with Granite claded pillar works completed.
Change Room Civil Works
Demolition of existing setup, 1200 sq.ft. construction of
change rooms, Bath Room, Toilets, Urinals and Wash Basin,
Wall Cladding by White Ceramic tiles. Antiskid Floor tiles,
'Z' Block granite Border and skirting, 'Z' Block wash basin
slab, POP cornists finishing for ceiling.
Change Room Plumbing and Sanitary
Hindware/Parryware Urinals, wash Basins, W.C. Galvanized Iron
plumbing pipes, PVC Drainage pipes, Jaguar/Florentine Sanitary
& Plumbing Fittings provided.
Aluminum Doors for change Room
Main entrance doors for Change Rooms, Toilets, Both Room &
Change Room Doors, Ventilators with Louvers.
Change Room Lockers
Provided 4 NO. Safety lockers fabricated out of steel.
Change Room Electrical Installation
Electrical Wiring done, Exhaust Fan, Smite Kids Electrical
Fittings Roma make, 2 unipro make electrical lamps fitted.
|